IH 35 Selma Ramp

IH 35 Selma Ramp Engineering

RJRA was responsible for all aspects of PS&E development of a new ramp onto IH 35 between Retama Parkway and Evans Road as well as the addition of an auxiliary lane and turn lane along the existing frontage road. Duties included contract administration, utility coordination, geometric design, retaining wall design, cross sections, specifications and estimates.

Back to Engineering Projects

IH 35 NB Entrance Ramp Interstate Access Justification Report

RJRA researched and compiled all the necessary data to address the eight policy points for the Interstate Access Justification Report (IAJR) needed for the IH 35 Northbound Entrance Ramp prior to the Evans Road/FM 1518 intersection. RJRA drafted and finalized the IAJR with assistance from key technical staff and consultants.

Back to Planning Projects